Solar Park Zeithain

On the site of the Zeithain Industrial Park in Saxony, we built a modern solar park with a total output of 72.5 MWp. The construction process was divided into different sections and posed a challenge in that the conversion area was heavily covered with explosive ordnance residues. In addition, large-scale concrete foundations had to be made.

  • 72.5 MWp ground-mounted photovoltaic plant
  • Ammmunition clearance over the entire area
  • More than 257,000 modules
  • Road length of approx. 8,735 m
  • 3,628.9 tons of steel used