On the site of the Zeithain Industrial Park in Saxony, we built a modern solar park with a total output of 72.5 MWp. The construction process was divided into different sections and posed a challenge in that the conversion area was heavily covered with explosive ordnance residues. In addition, large-scale concrete foundations had to be made.
- 72.5 MWp ground-mounted photovoltaic plant
- Ammmunition clearance over the entire area
- More than 257,000 modules
- Road length of approx. 8,735 m
- 3,628.9 tons of steel used